
Pedestrian walkway – Maestria residential Complex
The pedestrian walkway for the Meastria real estate complex is a unique project located in a ...

Parc Jean-Brillant, community shelter
Displaying different materials is a durable solution. Here you have a combination of galvanized steel,...

Montreal Olympic Stadium, upgrade to standards and renovation of the tower
This emblematic building, that symbolizes the 1976 Olympic games, needed to be...

Skybridge Pedestrian Bridge, Tour des Canadiens
This project, that required the design, fabrication, and installation of a structure in which ...

Expansion of the Bridor plant (phase 3)
The Challenge of this project was to get started at full speed to complete the ...

Maison Radio-Canada, interior Pedestrian walkways
These pedestrian walkways had to connect 2 buildings spaced by 25 m (80 feet) to allow...

Drummondville Library
Recipient of the IRAC award, Governor General of Canada, the structure was used to create a ...

Montréal Airport
When you arrive by plane from another country or when you are coming back home, the airport is the...

New Kraft Foods Warehouse
The complexity with the accomplishment of this enormous building was to successfully manage...

Ok tire, new regional warehouse
This tire warehouse is composed of multiple bays of 36 ft x 40 ft (11 x 12 meters) with a...

XTL transport, new distribution center
This new distribution center of 335 000 square feet (31 000 square meters) is composed of 230 ...

Sunlife multi-tenants
The particularity of this 210 000 square feet building (19 500 square meters) was to erect the ...

Lake & College building
We were awarded this project in a pre-grant competition, consequently, we had the mandate to ...

Carrefour Laval, Expansion
Since we were preselected as the steel structure manufacturer on this amazing project, we were ...

CLSC des faubourg
As a turn-key project, the real estate developer had the obligation to build a surface and ...

Westmount Gardens
In the estimation of a project, the total mass, the overhead clearance between floors and the total...

Montreal Forum, revitalisation of the Pepsi Center
This ambitious project changed this building in which our prestigious Canadian hockey ...

Anjou Shopping Center, new entryways, and renovation of the mall
The mandate obtained by Sofab as concept-assistance, was to build from sketches done by ...

Estruxture, Data center
In this project, for which Sofab participated in the elaboration of the concept in a ...

New Air Transat maintenance hangar
The construction challenge was defined by the complexity of the 230 feet (70 m) long span ...

Lake placid lodge
The 4 slope orientations of the roof were the most complex element of this hotel. Some...

Whitewind Maintenance hangar
This 60 feet-high (18 m) plane maintenance hangar, is made of thirty-eight (38) long span trusses, ...

Bluestone data center
This long rectangular building was constructed with more than 900 main and secondary trusses ...

Campus Bell
This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m) ...

Canadian National Defence, training gymnasium
A gymnasium means a clearance height free of all structures. This enlargement was made with...

Oxford properties, new roof including mechanical equipment
Erecting a structure over the 26th floor of a building in downtown Montreal is no picnic. To ...

University of Ottawa Heart Institute, hospital campus Expansion
This project was spread over a period of 4 years, with several phases and interventions...

Champlain bridge, reinforcement of ten spandrel beams
This bridge constructed in the 1960’s, was at the end of its useful lifetime. Despite the...