Campus Bell
This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m)
This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m)
A gymnasium means a clearance height free of all structures. This enlargement was made with
Erecting a structure over the 26th floor of a building in downtown Montreal is no picnic. To
This project was spread over a period of 4 years, with several phases and interventions
This bridge constructed in the 1960’s, was at the end of its useful lifetime. Despite the