![](https://sofab.ca/wp-content/uploads/2022/08/IMG_1480.png)
Pedestrian walkway – Maestria residential Complex
The pedestrian walkway for the Meastria real estate complex is a unique project located in a ...
![](https://sofab.ca/wp-content/uploads/2020/11/1-2014_IMG_8392_1.png)
Parc Jean-Brillant, community shelter
Displaying different materials is a durable solution. Here you have a combination of galvanized steel,...
![](https://sofab.ca/wp-content/uploads/2019/12/DSC0530_1.png)
Montreal Olympic Stadium, upgrade to standards and renovation of the tower
This emblematic building, that symbolizes the 1976 Olympic games, needed to be...
![](https://sofab.ca/wp-content/uploads/2020/11/10-Sofab-12_1.png)
Skybridge Pedestrian Bridge, Tour des Canadiens
This project, that required the design, fabrication, and installation of a structure in which ...
![](https://sofab.ca/wp-content/uploads/2020/11/2_DSC0003.png)
Expansion of the Bridor plant (phase 3)
The Challenge of this project was to get started at full speed to complete the ...
![](https://sofab.ca/wp-content/uploads/2020/11/5-IMG_7907-1_1.png)
Maison Radio-Canada, interior Pedestrian walkways
These pedestrian walkways had to connect 2 buildings spaced by 25 m (80 feet) to allow...
![](https://sofab.ca/wp-content/uploads/2020/11/bdd_01-1.png)
Drummondville Library
Recipient of the IRAC award, Governor General of Canada, the structure was used to create a ...
![](https://sofab.ca/wp-content/uploads/2020/11/10-IMG_0817_1.png)
Montréal Airport
When you arrive by plane from another country or when you are coming back home, the airport is the...
![](https://sofab.ca/wp-content/uploads/2020/10/5-IND3c_1.png)
New Kraft Foods Warehouse
The complexity with the accomplishment of this enormous building was to successfully manage...
![](https://sofab.ca/wp-content/uploads/2020/10/2-IMG_2881_1.png)
Ok tire, new regional warehouse
This tire warehouse is composed of multiple bays of 36 ft x 40 ft (11 x 12 meters) with a...
![](https://sofab.ca/wp-content/uploads/2020/10/4IMG_4553_1.png)
XTL transport, new distribution center
This new distribution center of 335 000 square feet (31 000 square meters) is composed of 230 ...
![](https://sofab.ca/wp-content/uploads/2020/10/1_DSC9971a_1.png)
Sunlife multi-tenants
The particularity of this 210 000 square feet building (19 500 square meters) was to erect the ...
![](https://sofab.ca/wp-content/uploads/2020/10/2-C3a_IMG_1.png)
Lake & College building
We were awarded this project in a pre-grant competition, consequently, we had the mandate to ...
![](https://sofab.ca/wp-content/uploads/2020/10/2_DSC0311_1.png)
Carrefour Laval, Expansion
Since we were preselected as the steel structure manufacturer on this amazing project, we were ...
![](https://sofab.ca/wp-content/uploads/2019/12/6-IMG_1167_1.png)
CLSC des faubourg
As a turn-key project, the real estate developer had the obligation to build a surface and ...
![](https://sofab.ca/wp-content/uploads/2019/12/2-23-09-2013-046_1.png)
Westmount Gardens
In the estimation of a project, the total mass, the overhead clearance between floors and the total...
![](https://sofab.ca/wp-content/uploads/2020/10/0.8-IMG_8382_1.png)
Montreal Forum, revitalisation of the Pepsi Center
This ambitious project changed this building in which our prestigious Canadian hockey ...
![](https://sofab.ca/wp-content/uploads/2020/10/7-IMG_0800_1.png)
Anjou Shopping Center, new entryways, and renovation of the mall
The mandate obtained by Sofab as concept-assistance, was to build from sketches done by ...
![](https://sofab.ca/wp-content/uploads/2019/12/2-IMG_7861_1.png)
Estruxture, Data center
In this project, for which Sofab participated in the elaboration of the concept in a ...
![](https://sofab.ca/wp-content/uploads/2020/11/IND4b-e1617803354842-1.jpg)
New Air Transat maintenance hangar
The construction challenge was defined by the complexity of the 230 feet (70 m) long span ...
![](https://sofab.ca/wp-content/uploads/2020/10/1-resort-9_1.png)
Lake placid lodge
The 4 slope orientations of the roof were the most complex element of this hotel. Some...
![](https://sofab.ca/wp-content/uploads/2020/11/IND2d1.png)
Whitewind Maintenance hangar
This 60 feet-high (18 m) plane maintenance hangar, is made of thirty-eight (38) long span trusses, ...
![](https://sofab.ca/wp-content/uploads/2020/10/IND1e1.png)
Bluestone data center
This long rectangular building was constructed with more than 900 main and secondary trusses ...
![](https://sofab.ca/wp-content/uploads/2020/10/1_DSC9995_1.png)
Campus Bell
This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m) ...
![](https://sofab.ca/wp-content/uploads/2020/10/3.1-IMG_9637_1.png)
Canadian National Defence, training gymnasium
A gymnasium means a clearance height free of all structures. This enlargement was made with...
![](https://sofab.ca/wp-content/uploads/2020/10/3-IMG_0527_1-2.png)
Oxford properties, new roof including mechanical equipment
Erecting a structure over the 26th floor of a building in downtown Montreal is no picnic. To ...
![](https://sofab.ca/wp-content/uploads/2020/10/1-IMG_7884_1.png)
University of Ottawa Heart Institute, hospital campus Expansion
This project was spread over a period of 4 years, with several phases and interventions...
![](https://sofab.ca/wp-content/uploads/2020/10/IMG_1601_1.png)
Champlain bridge, reinforcement of ten spandrel beams
This bridge constructed in the 1960’s, was at the end of its useful lifetime. Despite the...