The 4 slope orientations of the roof were the most complex element of this hotel. Some
The 4 slope orientations of the roof were the most complex element of this hotel. Some
This 60 feet-high (18 m) plane maintenance hangar, is made of thirty-eight (38) long span trusses,
This long rectangular building was constructed with more than 900 main and secondary trusses
This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m)
A gymnasium means a clearance height free of all structures. This enlargement was made with
Erecting a structure over the 26th floor of a building in downtown Montreal is no picnic. To
This project was spread over a period of 4 years, with several phases and interventions
This bridge constructed in the 1960’s, was at the end of its useful lifetime. Despite the