aDesign assistbComplexity Ingenuity
banniereAccueil

CAMPUS BELL

1_DSC9995
2-2008-06-18--011
3-2008-06-18--020
4-2008-06-19--003
5-2008-06-19--005
6 2008-06-19- 022
6-2008-06-19--022
previous arrowprevious arrow
next arrownext arrow
1_DSC9995
2-2008-06-18--011
3-2008-06-18--020
4-2008-06-19--003
5-2008-06-19--005
6 2008-06-19- 022
6-2008-06-19--022
previous arrow
next arrow

Campus Bell

This new Montreal Center required more than 800 tons of steel, including a 144 feet (44 m) partially exposed footbridge, being used as a link between two buildings of this operational center.
(The pictures represent the pedestrian walkway of the project)

  • Fabrication and installation in 4 cubic section
  • Five (5) prefabricated rigid frames
  • Two (2) inclined supporting columns

This work was granted an excellence award from the CISC (Canadian Institute of Steel Construction).

PROJECT

Campus Bell

AREA

Iles des Soeurs, Montréal, QC.

SUPERFICIES

800 tonnes

YEAR

2007