University of Ottawa Heart Institute, hospital campus Expansion

This project was spread over a period of 4 years, with several phases and interventions in the existing buildings. Below is the list of the interventions:

  • Installation of structures over an existing pedestrian tunnel with the adequate equipment for the usage of a tower crane, conventional crane, or forklifts to adapt to multiple restrained spaces
  • Construct along existing walls by being mindful of the existing interferences
  • Work in confined areas without harming the operations of the hospital
  • Reinforce the existing spaces for snow loads or to hang a new footbridge with cantilever beams
  • Fabricate and install an exposed structure (AESS) along the existing building

PROJECT

Expansion Hospital campus

AREA

Ottawa, ONT.

SUPERFICIES

000 pi.ca.

YEAR

2014-2019