Maison Radio-Canada, interior Pedestrian walkways

fLEED & AESSBy admin3 November 2020

These pedestrian walkways had to connect 2 buildings spaced by 25 m (80 feet) to allow

Drummondville Library

fLEED & AESSBy admin3 November 2020

Recipient of the IRAC award, Governor General of Canada, the structure was used to create a

Gate 64

Montréal Airport

fLEED & AESSBy admin3 November 2020

When you arrive by plane from another country or when you are coming back home, the airport is the

New Kraft Foods Warehouse

cLarge areasBy admin3 November 2020

The complexity with the accomplishment of this enormous building was to successfully manage

Ok tire, new regional warehouse

cLarge areasBy admin3 November 2020

This tire warehouse is composed of multiple bays of 36 ft x 40 ft (11 x 12 meters) with a

XTL transport, new distribution center

cLarge areasBy admin3 November 2020

This new distribution center of 335 000 square feet (31 000 square meters) is composed of 230

Sunlife multi-tenants

cLarge areasBy admin3 November 2020

The particularity of this 210 000 square feet building (19 500 square meters) was to erect the

Lake & College building

aDesign assistBy admin3 November 2020

We were awarded this project in a pre-grant competition, consequently, we had the mandate to

Carrefour Laval, Expansion

aDesign assistBy admin3 November 2020

Since we were preselected as the steel structure manufacturer on this amazing project, we were

CLSC des faubourg

eHybridBy admin3 November 2020

As a turn-key project, the real estate developer had the obligation to build a surface and